Category Archives: Uncategorized

About MBS

Mine Biomass Synergies Pte Ltd

Date Incorporated: 13 March 2017

Place Incorporated: Singapore

Established as Joint Venture between Japan (Envipro Holding, RS Asset Management) and Singapore

 

Incorporated Subsidiary

1.Mine Biomass Sdn Bhd as 100% owned in Kuantan Malaysia on19 April 2017

2.PT Mine Biomass Indonesia as 100% PMA company in Jakarta Indonesia (in process) July 2018

 

Core Business

  • Palm Kernel Shell (PKS)

 

Secondary Business

  • Empty Fruit Bunch (EFB) Pellet
  • Palm Kernel Expeller (PKE)

MALAYSIA

 

my-01

MALAYSIA 

MAIN OFFICE KUANTAN , MALAYSIA  

Establish  : April 2017

Main Office  : A1, 1st Floor , Jalan Stadium 25200 Kuantan , Pahang Darul Makmur, Malaysia

STOCKYARD: GEBENG INDUSTRIAL ESTATE KUANTAN MALAYSIA

ADDRESS: 73B – 1, Jalan Gebeng 1/6 Kawasan Perindustrian Gebeng ,26080 Kuantan Pahang

LOCATION MAP

 

INDONESIA

flag-indonesia

INDONESIA STOCKPILE


INDONESIA STOCKPILE ( PEKANBARU , SUMANTERA)

Establish in September 2018

Main Office : Jakarta

 

MINE BIOMASS STOCKPILE (PEKAN BARU ,SUMENTERA)

SIZE 

  • 22,000sqft fully covered cement floor warehouse
  • 30,000sqft open-air cement floor area

STORAGE: 15K

FACILITY

  • 1X Double meshed screening machine with magnetic separator
  • 24 hour CCTV monitoring system

LOADING POINT 

  • River Jetty: 5m draft handle 330ft barge
  • Loading : Direct truck -barge loading at 2000m/day
  • Distance: To Anchorage: 80 km to Sungai Anchorage
    Stockpile: 2km

 

 

MALAYSIA

 my-01

MALAYSIA STOCKPILE


MAIN OFFICE IN PAHANG DARUL MAKMUR 

Establish in April 2017

Main Office : A1 , 1st Floor, Jalan Stadium 25200 Kuantan , Pahang Darul        Makmur,Malaysia

MINE BIOMASS FACILITY  (GEBENG KUANTAN ) 

Storage capacity comprises of :

  • 15,000MT of Screened PKS in 70,000sqft covered concrete floor storage
  • 15,000MT of Unscreened PKS in 40,000sqft open-air hard surface storage
  • 30,000sqft open-air compacted ground for future storage expansion

CCTV & Secured storage 

  • 21 CCTV surveillance camera  to provide security and safety 24-hour monitoring of stockyard storage area

Double Mesh Screener Machines

  • Two sets of screening machine with a capacity of maximum 100MT per hour each

In-House Moisture Analysis 

  • Two Shimadzu Moisture Analyser to perform cross moisture testing

 

LOADING POINT 

Port: Seaport facing the South China Sea

Loading: Conveyor loading at 2500MT/DAY

Distance: 5KM from the stockpile